LTZ Augustenberg - Karlsruhe - Reference project Agri Photovoltaics in pome fruit cultivation - apples/pears
Planning, project planning and construction of an agrivoltaic system at LTZ Augustenberg, start of construction April/May 2024.
- Fixed east-west elevation approx. 216 kWp and east-west tracker system approx. 274 kWp
- Total generator output approx. 490 kWp
Technical details:
- Height lower edge of the modules 4.50 m
- Pile spacing of the elevation 5.00 m
- Elevation angle of the modules 10° (+/-2°)
- Two different module types, bifacial (tracker-system) and 50 % transparency (east-west elevation), monocrystalline solar cells with high efficiency
- Rainproof fastening strips
- Approx. 1 ha, existing plantation - 18 rows of apples and 4 rows of pears, a total of 2,000 trees, row length approx. 100 - 110 m
- Connected hail and insect protection net around and over the entire surface
- The side net can be detached from the tray after harvesting and rolled upwards
- Proof of stability through geotechnical expertise
- Concrete free fixation through rammed profiles
Thomas Franke and Martin Hibsch were responsible for sales support, planning and project planning, project support and monitoring through to commissioning with documentation.